South Oxfordshire District Council
Local plans
Contents
Joint Local Plan 2041
Joint plan with
Planning policy url
Plan period
2021-2041
Housing numbers
852.5*
Housing requirement yearly average
View source document
*Breakdown set for this local authority
Notes
South Oxfordshire has a standard method figure of 605 homes per annum*. Over a twenty-year plan period (2021 to 2041), this results in a total housing need of 12,100 homes. In addition to this, we have previously agreed through the last local plan to accommodate 4,950 homes for Oxford’s unmet need for the period 2021 to 2036. Therefore, between 2021 and 2036, the housing requirement is 935 homes per annum (our own needs, plus Oxford’s unmet need). Between 2036 and 2041, the housing requirement will reduce in line with the standard method to 605 dwellings per annum. This makes the total housing requirement over the plan period 17,050 homes.
The Vale of White Horse has a standard method figure of 628 homes per annum*. Over a twenty-year plan period (2021 to 2041), this results in a total housing need of 12,560 homes. In addition to this, we have previously agreed through the last local plan to accommodate 2,200 homes for Oxford’s unmet need for the period 2019 to 2031. This equates to 183 homes per annum, which will continue to form part of the housing requirement from 2021 to 2031. Therefore, between 2021 and 2031, the housing requirement will be 811 homes per annum. Between 2031 and 2041, the housing requirement will reduce in line with the standard method to 628 dwellings per annum. This makes the total housing requirement over the plan period 14,390 homes.
*Calculated using the 2022 affordability ratio. This figure will change each year.
PINS data
Local development framework number: 2114
emerging
01 Jan 2021
PINS Timeline
emerging | 01 Jan 2021 |
---|
South Oxfordshire Local Plan 2035
Planning policy url
Plan period
2011-2035
Housing numbers
23,550
Housing requirement total
View source document
Notes
MM1 extended plan period to 2035 (was 2034).
MM5 provides an updated overall housing requirement for plan period (but retains same DPA). Total requirement is made up of: (1) South Oxfordshire Minimum housing requirement - 18,600; and (2) 4,950 homes addressing Oxford's unmet housing need. Total requirement is 23,550. Annual requirement is 2011/12 to 2025/26 - 900 DPA; 2026/27 to 2031/32 1,120 DPA; 2032/33 to 2034/5 1,110 DPA.
PINS data
Local development framework number: 1859
adopted
10 Dec 2020
PINS Timeline
published | 07 Jan 2019 |
---|---|
submitted | 29 Mar 2019 |
sound | 27 Nov 2020 |
adopted | 10 Dec 2020 |