London Borough of Newham
Local plans
Contents
Newham Local Plan Review
Planning policy url
Plan period
2021-2038
Housing numbers
46663 to 52133
Housing requirement range
View source document
Notes
Newham’s housing target in the plan period from 2021 to 2038 is a capacity derived range between 46,633 and 52,133.
Newham’s 10-year London Plan target is to deliver 32,800 homes between 2019 and 2029.
Newham’s local plan covers the entire borough and sets out a 10-year London Plan target that includes the LLDC portion, which has been calculated as 14,800 for the Newham portion of LLDC. Based on Newham’s housing target in the draft plan, there is a shortfall of 15,721 homes after the 10-year London Plan period measured against the London Plan target of 47,600 homes for Newham until 2029. This is not made up in the later
phases of Newham’s plan.
PINS data
Local development framework number: 2297
emerging
01 Jan 2021
PINS Timeline
emerging | 01 Jan 2021 |
---|
Newham Local Plan 2018
Planning policy url
Plan period
2018-2033
Housing numbers
43,000
Housing requirement total
View source document
Notes
Stepped trajectory:
Short Term 2018/19 – 2022/23 = 2752
Medium Term 2023/24 – 2027/28 = 3956
Long Term 2028/29 – 2032/33 = 1892
PINS data
Local development framework number: 1876
adopted
10 Dec 2018
PINS Timeline
published | 28 Nov 2017 |
---|---|
submitted | 28 Feb 2018 |
sound | 26 Nov 2018 |
adopted | 10 Dec 2018 |